Link to Locker Group Ltd home page
Contact Sales: 01925 406618
Site Map
click here for Locker Group Home Page

Achilles logo
The Contractors Health and Safety Assessment Scheme Accredited
BS EN ISO 9001:2008 Certificate No. Q05104.
BS EN ISO 9001:2008
Certificate No Q 05104

Material: Gladstone PC 100/10 Architectural Mesh

Project Name: Bourg Walk Bridge, Aylesbury

Gladstone PC 100/10 architectural mesh installed as bridge balustrading on the Bourg Walk Bridge in Aylesbury.

Gladstone PC 100/10 architectural mesh installed as bridge balustrading on the Bourg Walk Bridge in Aylesbury.

The Bourg Walk Bridge (also called the Southcourt Bridge or the Roberts Bridge after a local councillor) opened in March 2009 connecting Southcourt to Aylesbury town centre. The focus of the footbridge is a central concrete pillar with four suspension cables supporting the structure. This bridge forms a central part of the Aylesbury Hub project.

Bourg Walk was nominated and won the Engineering Excellence Award 2009 awarded by the Institution of Civil Engineers - South East England branch.

Gladstone PC 100/10 architectural mesh installed as bridge balustrading on the Bourg Walk Bridge in Aylesbury.

Gladstone PC 100/10 architectural mesh installed as bridge balustrading on the Bourg Walk Bridge in Aylesbury.

View project location using Google maps



View Larger Map

Quick Links

Further Information

© 2017 Locker Architectural Ltd | Privacy Policy and Site Terms of Use
Site by Beech Web Services